ITAC Assessment: UD0860
ITAC logo
ITAC Assessment: UD0860
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Reprocessed Metal Components
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 40,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,450
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,240 443,800
kWh
Electricity Demand $24,424 2,916
kW-mo/yr
Natural Gas $38,886 5,740
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $270 $500 $261
3,823
kWh
- - $9
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $519 - $260
3,793
kWh
$259
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $267 $1,000 $166
2,419
kWh
$101
-
kW-mo/yr
- -
04 2.7224: Reduce space conditioning during non-working hours $11,863 $5,250 - - $11,863
-
MMBtu
-
05 2.7492: Use proper thickness of insulation on building envelope $565 $900 - - $565
-
MMBtu
-
TOTAL RECOMMENDED $13,484 $7,650 $687
10,035
kWh
$360
-
kW-mo/yr
$12,428
-
MMBtu
$9
TOTAL IMPLEMENTED $12,649 $6,250 $426
6,212
kWh
$360
-
kW-mo/yr
$11,863
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs