ITAC Assessment: UD0857
ITAC logo
ITAC Assessment: UD0857
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Powder Coated Metal Parts
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 75,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,914 1,231,921
kWh
Electricity Demand $16,927 3,588
kW-mo/yr
Electricity Fees $192 -
Natural Gas $199,542 27,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 3.1222: Reduce water use with counter current rinsing $4,781 $2,000 - - - $4,781
-
Tgal
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,979 $11,880 $3,701
50,953
kWh
$1,155
-
kW-mo/yr
- - $123 - -
03 2.6212: Turn off equipment during breaks, reduce operating time $3,696 $6,800 $1,206
16,606
kWh
- - $2,490
-
Tgal
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,324 $15,150 $6,240
85,907
kWh
$1,084
-
kW-mo/yr
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $834 $2,000 $686
9,439
kWh
$148
-
kW-mo/yr
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $807 $1,000 $910
12,533
kWh
$197
-
kW-mo/yr
- - - $(-300.0) -
07 2.1114: Limit and control secondary combustion air in furnace $7,051 $2,000 - - $7,051
-
MMBtu
- - - -
08 2.2414: Use waste heat from hot flue gases to preheat $12,178 $36,000 - - $12,178
-
MMBtu
- - - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $4,816 $2,680 - - $4,816
-
MMBtu
- - - -
10 2.9114: Use solar heat to make electricty $19,437 $211,596 $5,383
74,110
kWh
- - - - - $14,054
TOTAL RECOMMENDED $65,903 $291,106 $18,126
249,548
kWh
$2,584
-
kW-mo/yr
$24,045
-
MMBtu
$7,271
-
Tgal
$123 $(-300.0) $14,054
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs