Assessment Year | 2009 |
---|---|
Principal Product | Pharmaceuticals |
NAICS | 325411: Medicinal and Botanical Manufacturing |
SIC | 2833: Medicinal Chemicals and Botanical Products |
Sales Range | $50 M to 100M |
# of Employees | 325 |
Plant Area |
86,000
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $451,912 | 9,488,250 |
kWh
|
$0.048 |
Electricity Demand | $151,085 | 17,964 |
kW-mo/yr
|
$8.41 |
Electricity Fees | $14,835 | - |
|
- |
Natural Gas | $1,063,161 | 91,043 |
MMBtu
|
$11.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,148 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,993 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $5,716 | $10,000 | - | - |
$4,874
-
MMBtu
|
- | - |
$842
-
Tgal
|
|
02 | 2.2127: Flash condensate to produce lower pressure steam | $18,020 | $25,000 | - | - |
$16,325
-
MMBtu
|
- | - |
$1,695
-
Tgal
|
|
03 | 3.4114: Replace city water with recycled water via cooling tower | $5,889 | $6,500 |
$(-200.0)
(-2,500)
kWh
|
- | - | - | - |
$6,089
-
Tgal
|
|
04 | 2.4151: Develop a repair/replace policy | $4,320 | $6,886 |
$3,130
65,712
kWh
|
$1,190
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $257 | $100 |
$687
14,435
kWh
|
$170
-
kW-mo/yr
|
- | $(-300.0) | $(-300.0) | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,946 | $59,958 |
$11,208
235,324
kWh
|
$2,738
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $48,148 | $108,444 |
$14,825
312,971
kWh
|
$4,098
-
kW-mo/yr
|
$21,199
-
MMBtu
|
$(-300.0) | $(-300.0) |
$8,626
-
Tgal
|
||
TOTAL IMPLEMENTED | $23,993 | $35,100 |
$687
14,435
kWh
|
$170
-
kW-mo/yr
|
$21,199
-
MMBtu
|
$(-300.0) | $(-300.0) |
$2,537
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs