ITAC Assessment: UD0856
ITAC logo
ITAC Assessment: UD0856
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Vacuum Impregnation
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 30,000
ft2
Annual Production 284,251
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,486 1,368,700
kWh
Electricity Demand $39,400 3,768
kW-mo/yr
Natural Gas $10,820 1,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,482 $8,415 $4,621
64,714
kWh
$1,793
-
kW-mo/yr
- - $68 -
02 2.7135: Install occupancy sensors $720 $300 $720
10,080
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $441 $2,025 $317
4,468
kWh
$124
-
kW-mo/yr
- - - -
04 2.4131: Size electric motors for peak operating efficiency $6,690 $5,370 $4,820
67,500
kWh
$1,870
-
kW-mo/yr
- - - -
05 2.4239: Eliminate or reduce compressed air usage $3,442 $2,160 $2,318
32,462
kWh
$1,124
-
kW-mo/yr
- - - -
06 2.4239: Eliminate or reduce compressed air usage $1,802 $700 $1,278
17,892
kWh
$524
-
kW-mo/yr
- - - -
07 2.4221: Install compressor air intakes in coolest locations $1,339 $1,500 $965
13,515
kWh
$374
-
kW-mo/yr
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $782 $50 $412
5,772
kWh
$370
-
kW-mo/yr
- - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $240 $1,000 $324
4,538
kWh
$126
-
kW-mo/yr
- $(-210.0) - -
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,452 $30,000 $16,291
228,090
kWh
- $(-4,839.0)
-
MMBtu
- - -
11 2.7314: Reduce ventilation air $4,756 $8,600 $1,184
16,581
kWh
$459
-
kW-mo/yr
$3,113
-
MMBtu
- - -
12 2.9114: Use solar heat to make electricty $27,298 $181,738 $5,346
74,870
kWh
- - - - $21,952
TOTAL RECOMMENDED $65,444 $241,858 $38,596
540,482
kWh
$6,764
-
kW-mo/yr
$(-1,726.0)
-
MMBtu
$(-210.0) $68 $21,952
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs