ITAC Assessment: UD0852
ITAC logo
ITAC Assessment: UD0852
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Plastic Bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 255,105
ft2
Annual Production 40,141,300
lb
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,396,729 31,601,500
kWh
Electricity Demand $948,205 67,392
kW-mo/yr
Natural Gas $22,442 2,859
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $357,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,688

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $156,438 $342,000 $93,765
2,227,000
kWh
$62,673
-
kW-mo/yr
- -
02 2.6241: Reduce temperature of process equipment when on standby $13,731 $8,250 $8,230
195,496
kWh
$5,501
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,349 - $809
19,205
kWh
$540
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,934 $6,000 $31,430
746,548
kWh
$10,504
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,072 $1,000 $3,160
75,055
kWh
$2,112
-
kW-mo/yr
$(-1,200.0) -
06 2.4221: Install compressor air intakes in coolest locations $2,716 $5,000 $1,628
38,656
kWh
$1,088
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $94,327 $190,000 $55,067
1,308,000
kWh
$36,807
-
kW-mo/yr
- $2,453
08 2.2614: Use cooling tower or economizer to replace chiller cooling $15,333 $50,000 $10,330
245,364
kWh
$5,003
-
kW-mo/yr
- -
09 2.9114: Use solar heat to make electricty $27,604 $106,738 $2,937
69,753
kWh
- - $24,667
TOTAL RECOMMENDED $357,504 $708,988 $207,356
4,925,077
kWh
$124,228
-
kW-mo/yr
$(-1,200.0) $27,120
TOTAL IMPLEMENTED $62,688 $57,000 $45,729
1,086,172
kWh
$18,159
-
kW-mo/yr
$(-1,200.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs