ITAC Assessment: UD0851
ITAC logo
ITAC Assessment: UD0851
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Paint
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $100
M
to 500
M
# of Employees 192
Plant Area 216,437
ft2
Annual Production 4,669
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $346,659 6,503,400
kWh
Electricity Demand $203,500 13,560
kW-mo/yr
Natural Gas $294,363 56,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $12,842 $42,695 $1,688
29,040
kWh
- $7,623 - - - $3,531
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,873 $4,016 $7,671
131,993
kWh
$2,863
-
kW-mo/yr
- - - $339 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,335 $3,379 $5,516
94,913
kWh
$2,863
-
kW-mo/yr
- - $(-44.0) - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,426 $3,660 $520
8,954
kWh
$891
-
kW-mo/yr
- - $15 - -
05 2.4131: Size electric motors for peak operating efficiency $7,266 $7,300 $5,829
100,288
kWh
$1,437
-
kW-mo/yr
- - - - -
06 2.4224: Upgrade controls on compressors $15,652 $20,000 $11,372
195,672
kWh
$4,280
-
kW-mo/yr
- - - - -
07 2.4239: Eliminate or reduce compressed air usage $8,543 - $5,789
99,608
kWh
$2,754
-
kW-mo/yr
- - - - -
08 2.2437: Recover waste heat from equipment $5,739 $12,000 $(-80.0)
(-1,380)
kWh
$(-39.0)
-
kW-mo/yr
- $5,858
-
MMBtu
- - -
09 2.4221: Install compressor air intakes in coolest locations $4,111 $5,000 $2,786
47,935
kWh
$1,325
-
kW-mo/yr
- - - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,847 $1,000 $2,271
32,040
kWh
$876
-
kW-mo/yr
- - - $(-300.0) -
11 2.2425: Use flue gases to heat process or service water $69,895 $32,000 - - - $69,895
-
MMBtu
- - -
12 2.2414: Use waste heat from hot flue gases to preheat $27,723 $31,000 - - - $27,723
-
MMBtu
- - -
13 2.1241: Reduce excessive boiler blowdown $5,863 $5,000 - - - $5,863
-
MMBtu
- - -
14 2.1233: Analyze flue gas for proper air/fuel ratio $5,300 $1,000 - - - $5,300
-
MMBtu
- - -
15 2.7314: Reduce ventilation air $10,721 $32,160 $1,672
28,768
kWh
- - $9,049
-
MMBtu
- - -
TOTAL RECOMMENDED $197,136 $200,210 $45,034
767,831
kWh
$17,250
-
kW-mo/yr
$7,623 $123,688
-
MMBtu
$(-29.0) $39 $3,531
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs