ITAC Assessment: UM0216
ITAC logo
ITAC Assessment: UM0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Precision turning and boring machines, and C.N.C machinery
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 93,991
ft2
Annual Production 40
pieces
Production Hrs. Annual 4,862
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,282 1,281,275
kWh
Electricity Demand $29,876 3,480
kW-mo/yr
Electricity Fees $4,039 -
Natural Gas $27,384 7,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,873 $1,125 $1,099
31,510
kWh
$774
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $1,100 $500 - - $1,100
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,056 $500 $1,796
51,418
kWh
$1,260
-
kW-mo/yr
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $1,000 $2,000 - - $1,000
-
MMBtu
05 2.7135: Install occupancy sensors $222 $620 $222
9,309
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,496 $7,269 $606
25,370
kWh
$1,890
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,747 $12,014 $3,723
117,607
kWh
$3,924
-
kW-mo/yr
$2,100
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs