| Assessment Year | 2002 |
|---|---|
| Principal Product | Precision turning and boring machines, and C.N.C machinery |
| NAICS |
n/a
|
| SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
93,991
ft2
|
| Annual Production | 40
pieces
|
| Production Hrs. Annual | 4,862
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $42,282 | 1,281,275 |
kWh
|
$0.033 |
| Electricity Demand | $29,876 | 3,480 |
kW-mo/yr
|
$8.59 |
| Electricity Fees | $4,039 | - |
|
- |
| Natural Gas | $27,384 | 7,484 |
MMBtu
|
$3.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,873 | $1,125 |
$1,099
31,510
kWh
|
$774
-
kW-mo/yr
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $1,100 | $500 | - | - |
$1,100
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,056 | $500 |
$1,796
51,418
kWh
|
$1,260
-
kW-mo/yr
|
- | |
| 04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,000 | $2,000 | - | - |
$1,000
-
MMBtu
|
|
| 05 | 2.7135: Install occupancy sensors | $222 | $620 |
$222
9,309
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,496 | $7,269 |
$606
25,370
kWh
|
$1,890
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $9,747 | $12,014 |
$3,723
117,607
kWh
|
$3,924
-
kW-mo/yr
|
$2,100
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs