ITAC Assessment: UD0847
ITAC logo
ITAC Assessment: UD0847
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Custom Machining
NAICS 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 216
Plant Area 300,000
ft2
Annual Production 2,500,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,872 4,915,064
kWh
Electricity Demand $36,432 12,828
kW-mo/yr
Natural Gas $68,619 6,385
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $436 $374 $328
3,960
kWh
$34
-
kW-mo/yr
- $74
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,694 - $4,967
51,213
kWh
$727
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $4,177 - $4,177
50,457
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $821 $1,880 $745
9,000
kWh
$76
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $2,953 $1,500 - - $2,953
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $590 $500 $535
6,465
kWh
$55
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $157 $1,000 $414
4,995
kWh
$43
-
kW-mo/yr
- $(-300.0)
08 2.6218: Turn off equipment when not in use $1,162 - $1,162
5,462
kWh
- - -
09 2.2511: Insulate bare equipment $175 $200 $175
2,112
kWh
- - -
10 2.7314: Reduce ventilation air $9,297 $11,500 $2,553
30,840
kWh
- $6,744
-
MMBtu
-
11 2.7314: Reduce ventilation air $5,243 - $523
6,319
kWh
$45
-
kW-mo/yr
$4,675
-
MMBtu
-
12 2.7232: Replace existing hvac unit with high efficiency model $4,403 $22,015 $4,403
37,750
kWh
- - -
TOTAL RECOMMENDED $35,108 $38,969 $19,982
208,573
kWh
$980
-
kW-mo/yr
$14,372
-
MMBtu
$(-226.0)
TOTAL IMPLEMENTED $13,823 $22,015 $9,103
94,526
kWh
$45
-
kW-mo/yr
$4,675
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs