| Assessment Year | 1990 |
|---|---|
| Principal Product | PLASTIC CONTAINERS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 145 |
| Plant Area |
n/a
|
| Annual Production | 8,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $658,268 | 9,089,097 |
kWh
|
$0.072 |
| Natural Gas | $71,135 | 18,695 |
MMBtu
|
$3.81 |
| Fuel Oil #4 | $68,977 | 20,880 |
MMBtu
|
$3.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $144,712 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,329 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $2,564 | $132 |
$2,564
36,635
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,185 | $725 |
$4,185
59,789
kWh
|
- | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $11,329 | - |
$11,329
161,782
kWh
|
- | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,409 | $500 | - |
$4,275
-
MMBtu
|
$4,134
-
MMBtu
|
|
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $2,725 | $8,460 |
$(-695.0)
(-9,965)
kWh
|
$3,420
-
MMBtu
|
- | |
| 06 | 2.2211: Use optimum temperature | $115,500 | - |
$115,500
1,650,059
kWh
|
- | - | |
| TOTAL RECOMMENDED | $144,712 | $9,817 |
$132,883
1,898,300
kWh
|
$7,695
-
MMBtu
|
$4,134
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,329 | - |
$11,329
161,782
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs