ITAC Assessment: UD0838
ITAC logo
ITAC Assessment: UD0838
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Automotive Textile Acoustical Systems
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 192,000
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,604 10,831,200
kWh
Electricity Demand $384,025 28,680
kW-mo/yr
Natural Gas $27,102 2,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 3.4111: Use closed cycle process to minimize waste water production $9,635 $15,000 - - - $4,766
-
Tgal
- $4,869
-
Tgal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $47,095 $55,000 $25,026
582,000
kWh
$18,703
-
kW-mo/yr
- - $3,366 -
03 2.4321: Upgrade obsolete equipment $14,654 $20,000 $9,030
210,000
kWh
$5,624
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,238 $500 $1,564
36,361
kWh
$974
-
kW-mo/yr
- - $(-300.0) -
05 2.4221: Install compressor air intakes in coolest locations $2,034 $7,000 $1,253
29,150
kWh
$781
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,370 $124,541 $8,401
195,375
kWh
$15,969
-
kW-mo/yr
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,828 $100,000 $12,831
298,400
kWh
$4,997
-
kW-mo/yr
- - - -
08 2.7243: Improve air circulation with destratification fans / other methods $11,630 $78,000 $(-506.0)
(-11,765)
kWh
$(-305.0)
-
kW-mo/yr
$12,441
-
MMBtu
- - -
09 2.2437: Recover waste heat from equipment $7,585 $15,000 - - $7,585
-
MMBtu
- - -
10 2.7224: Reduce space conditioning during non-working hours $5,749 $125 - - $5,749
-
MMBtu
- - -
TOTAL RECOMMENDED $142,818 $415,166 $57,599
1,339,521
kWh
$46,743
-
kW-mo/yr
$25,775
-
MMBtu
$4,766
-
Tgal
$3,066 $4,869
-
Tgal
TOTAL IMPLEMENTED $22,641 $20,625 $10,594
246,361
kWh
$6,598
-
kW-mo/yr
$5,749
-
MMBtu
- $(-300.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs