Assessment Year | 2011 |
---|---|
Principal Product | Industrial Knives, Heat Treating |
NAICS | 333515: Cutting Tool and Machine Tool Accessory Manufacturing |
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
60,000
ft2
|
Annual Production | 5,433,000
pieces
|
Production Hrs. Annual | 7,100
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,538 | 2,347,595 |
kWh
|
$0.085 |
Electricity Demand | $37,817 | 7,980 |
kW-mo/yr
|
$4.74 |
Natural Gas | $67,966 | 8,585 |
MMBtu
|
$7.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,572 | $7,595 |
$5,591
62,604
kWh
|
$507
-
kW-mo/yr
|
- | $474 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,869 | $4,935 |
$5,139
57,551
kWh
|
$453
-
kW-mo/yr
|
- | $277 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,500 | $2,916 |
$1,173
13,140
kWh
|
$298
-
kW-mo/yr
|
- | $29 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $382 | $2,281 |
$294
3,295
kWh
|
$57
-
kW-mo/yr
|
- | $31 | |
05 | 2.4151: Develop a repair/replace policy | $1,689 | $3,536 |
$1,499
16,788
kWh
|
$190
-
kW-mo/yr
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $234 | $25 |
$196
2,305
kWh
|
$38
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,735 | $50 |
$2,508
28,078
kWh
|
$227
-
kW-mo/yr
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $1,623 | $1,200 |
$1,374
15,387
kWh
|
$249
-
kW-mo/yr
|
- | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $538 | $75 |
$462
5,177
kWh
|
$76
-
kW-mo/yr
|
- | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,017 | $500 |
$933
10,444
kWh
|
$84
-
kW-mo/yr
|
- | - | |
11 | 2.2414: Use waste heat from hot flue gases to preheat | $10,692 | $25,000 | - | - |
$10,692
-
MMBtu
|
- | |
12 | 2.2522: Isolate hot or cold equipment | $2,952 | $11,720 |
$2,930
32,815
kWh
|
$22
-
kW-mo/yr
|
- | - | |
13 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $2,991 | $11,835 | - | - |
$2,991
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $38,794 | $71,668 |
$22,099
247,584
kWh
|
$2,201
-
kW-mo/yr
|
$13,683
-
MMBtu
|
$811 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs