Assessment Year | 2011 |
---|---|
Principal Product | Tooling Equipment & Interior Automobile Parts |
NAICS | 541330: Engineering Services |
SIC | 8711: Engineering Services |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
60,000
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,070 | 884,320 |
kWh
|
$0.072 |
Electricity Demand | $69,409 | 318 |
kW-mo/yr
|
$218.27 |
Natural Gas | $14,665 | 1,476 |
MMBtu
|
$9.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,406 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,457 | $10,725 |
$10,777
215,536
kWh
|
$7,751
-
kW-mo/yr
|
- | - | - | $(-71.0) | |
02 | 2.7144: Install spectral reflectors / delamp | $2,068 | $2,856 |
$1,440
28,809
kWh
|
$628
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7135: Install occupancy sensors | $1,862 | $313 |
$1,562
31,241
kWh
|
- | - | - | $300 | - | |
04 | 2.7144: Install spectral reflectors / delamp | $1,711 | $1,200 |
$1,289
25,772
kWh
|
$422
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,046 | $3,750 |
$1,971
39,429
kWh
|
$1,075
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4313: Provide proper maintenance of motor driven equipment | $1,738 | $5,214 |
$1,011
20,218
kWh
|
$727
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,121 | $500 |
$1,560
21,667
kWh
|
$186
-
kW-mo/yr
|
- | $(-625.0) | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $547 | $500 |
$318
6,359
kWh
|
$229
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,252 | $4,557 |
$2,252
45,047
kWh
|
- | - | - | - | - | |
10 | 2.2522: Isolate hot or cold equipment | $546 | $250 |
$276
5,526
kWh
|
$270
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.7235: Install fossil fuel make-up air unit | $2,189 | $9,500 | - | - |
$2,189
-
MMBtu
|
- | - | - | |
12 | 2.7224: Reduce space conditioning during non-working hours | $1,647 | $25 | - | - |
$1,647
-
MMBtu
|
- | - | - | |
13 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $688 | $1,500 | - | - |
$688
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $37,872 | $40,890 |
$22,456
439,604
kWh
|
$11,288
-
kW-mo/yr
|
$4,524
-
MMBtu
|
$(-625.0) | $300 | $(-71.0) | ||
TOTAL IMPLEMENTED | $3,406 | $6,214 |
$2,889
48,244
kWh
|
$1,142
-
kW-mo/yr
|
- | $(-625.0) | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs