ITAC Assessment: UD0828
ITAC logo
ITAC Assessment: UD0828
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product advertisments
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $100
M
to 500
M
# of Employees 212
Plant Area 144,000
ft2
Annual Production 8,740,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,283,907 17,807,909
kWh
Natural Gas $538,551 91,122
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $281,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $2,599 $2,599 - - $2,599 - -
02 2.7122: Disconnect ballasts $4,524 $550 $3,168
69,028
kWh
$1,356
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $2,693 $2,405 $1,886
41,084
kWh
$807
-
kW-mo/yr
- - -
04 2.7311: Ventilation system to shut off when room is not in use $86,333 $28,000 $41,340
980,244
kWh
- - $44,993
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $28,346 $12,800 $28,346
617,554
kWh
- - - -
06 2.4133: Use most efficient type of electric motors $17,796 $62,106 $17,796
247,178
kWh
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,431 $1,200 $4,248
92,564
kWh
$2,183
-
kW-mo/yr
- - -
08 2.6218: Turn off equipment when not in use $4,272 $14,000 $4,272
93,075
kWh
- - - -
09 2.4224: Upgrade controls on compressors $6,407 $2,100 $6,407
139,599
kWh
- - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,710 $500 $1,688
36,792
kWh
$722
-
kW-mo/yr
- - $300
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,598 $500 $9,523
207,467
kWh
$4,075
-
kW-mo/yr
- - -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,066 $5,000 $4,248
92,551
kWh
$1,818
-
kW-mo/yr
- - -
13 2.2612: Use cooling tower water instead of refrigeration $16,653 $25 $12,275
267,429
kWh
$4,378
-
kW-mo/yr
- - -
14 2.2621: Modify refrigeration system to operate at a lower pressure $11,308 $25 $7,919
172,535
kWh
$3,389
-
kW-mo/yr
- - -
15 2.2621: Modify refrigeration system to operate at a lower pressure $990 $250 $990
21,568
kWh
- - - -
16 2.2437: Recover waste heat from equipment $52,035 $62,500 $(-6,567.0)
(-143,080)
kWh
$(-4,818.0)
-
kW-mo/yr
- $63,420
-
MMBtu
-
17 2.7235: Install fossil fuel make-up air unit $15,589 $35,000 - - - $15,589
-
MMBtu
-
18 2.2437: Recover waste heat from equipment $3,601 $25 - - - $3,601
-
MMBtu
-
TOTAL RECOMMENDED $281,951 $229,585 $137,539
2,935,588
kWh
$13,910
-
kW-mo/yr
$2,599 $127,603
-
MMBtu
$300
TOTAL IMPLEMENTED $43,590 $63,831 $36,007
643,963
kWh
$7,283
-
kW-mo/yr
- - $300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings