ITAC Assessment: MA0040
ITAC logo
ITAC Assessment: MA0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MAGNETIC FLUID,SEALS
NAICS
n/a
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 120,000
pieces
Production Hrs. Annual 3,570
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,374 1,033,118
kWh
Natural Gas $17,144 2,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,976 $253 $1,976
26,377
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $1,275 - - $1,275
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $88 - $88
1,172
kWh
-
04 2.6232: Install set-back timers $285 $97 $285
3,810
kWh
-
TOTAL RECOMMENDED $3,624 $350 $2,349
31,359
kWh
$1,275
-
MMBtu
TOTAL IMPLEMENTED $3,536 $350 $2,261
30,187
kWh
$1,275
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs