ITAC Assessment: NC0284
ITAC logo
ITAC Assessment: NC0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product mattress tape and fabric
NAICS 313210: Broadwoven Fabric Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 120,000
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,596 4,653,990
kWh
Electricity Demand $109,352 11,867
kW-mo/yr
Electricity Fees $12,161 -
Natural Gas $103,728 11,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,967

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,310 $26,200 $12,310
516,995
kWh
- -
02 2.4226: Use / purchase optimum sized compressor $3,667 $10,600 $2,205
77,580
kWh
$1,462
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $3,971 $5,000 $2,023
68,920
kWh
$1,948
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $1,345 $2,904 $808
28,429
kWh
$537
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,521 $1,002 $775
26,400
kWh
$746
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $914 $887 $635
21,637
kWh
$279
-
kW-mo/yr
-
07 2.1133: Adjust burners for efficient operation $469 $1,000 - - $469
-
MMBtu
08 2.2511: Insulate bare equipment $381 $528 - - $381
-
MMBtu
TOTAL RECOMMENDED $24,578 $48,121 $18,756
739,961
kWh
$4,972
-
kW-mo/yr
$850
-
MMBtu
TOTAL IMPLEMENTED $17,967 $38,802 $15,290
620,975
kWh
$2,208
-
kW-mo/yr
$469
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs