ITAC Assessment: UU0026
ITAC logo
ITAC Assessment: UU0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Silver Bullion
NAICS
n/a
SIC 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 35,000
ft2
Annual Production 375,000
lb
Production Hrs. Annual 6,251
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,672 812,760
kWh
Electricity Demand $34,283 337
kW-mo/yr
Electricity Fees $7,848 -
Natural Gas $181,909 30,979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,573

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $4,189 - - - $4,189
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $31,788 $2,667 $11,613
385,371
kWh
$20,175
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,573 - - $1,573
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $3,197 $3,100 - $3,197
-
kW-mo/yr
- -
05 2.1113: Reduce combustion air flow to optimum $10,389 $2,110 - - $10,389
-
MMBtu
-
06 2.1116: Improve combustion control capability $260 $1,200 - - $260
-
MMBtu
-
07 3.5311: Recover and reuse waste material $1,499 - - - - $1,499
-
lb
TOTAL RECOMMENDED $52,895 $9,077 $11,613
385,371
kWh
$24,945
-
kW-mo/yr
$14,838
-
MMBtu
$1,499
-
lb
TOTAL IMPLEMENTED $1,573 - - $1,573
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs