Assessment Year | 2002 |
---|---|
Principal Product | Silver Bullion |
NAICS |
n/a
|
SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
35,000
ft2
|
Annual Production | 375,000
lb
|
Production Hrs. Annual | 6,251
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $21,672 | 812,760 |
kWh
|
$0.027 |
Electricity Demand | $34,283 | 337 |
kW-mo/yr
|
$101.73 |
Electricity Fees | $7,848 | - |
|
- |
Natural Gas | $181,909 | 30,979 |
MMBtu
|
$5.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,895 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,573 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $4,189 | - | - | - |
$4,189
-
MMBtu
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $31,788 | $2,667 |
$11,613
385,371
kWh
|
$20,175
-
kW-mo/yr
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,573 | - | - |
$1,573
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $3,197 | $3,100 | - |
$3,197
-
kW-mo/yr
|
- | - | |
05 | 2.1113: Reduce combustion air flow to optimum | $10,389 | $2,110 | - | - |
$10,389
-
MMBtu
|
- | |
06 | 2.1116: Improve combustion control capability | $260 | $1,200 | - | - |
$260
-
MMBtu
|
- | |
07 | 3.5311: Recover and reuse waste material | $1,499 | - | - | - | - |
$1,499
-
lb
|
|
TOTAL RECOMMENDED | $52,895 | $9,077 |
$11,613
385,371
kWh
|
$24,945
-
kW-mo/yr
|
$14,838
-
MMBtu
|
$1,499
-
lb
|
||
TOTAL IMPLEMENTED | $1,573 | - | - |
$1,573
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs