| Assessment Year | 2010 |
|---|---|
| Principal Product | Silicone Release Liners |
| NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
36,700
ft2
|
| Annual Production | 180,000
thousand feet
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,057 | 1,515,300 |
kWh
|
$0.040 |
| Electricity Demand | $61,057 | 360 |
kW-mo/yr
|
$169.60 |
| Natural Gas | $187,821 | 16,506 |
MMBtu
|
$11.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $82,826 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,371 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,622 | $2,500 |
$3,647
77,933
kWh
|
$2,381
-
kW-mo/yr
|
- | $594 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,036 | $2,500 |
$879
18,792
kWh
|
$1,148
-
kW-mo/yr
|
- | $9 | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $978 | $60 |
$494
10,560
kWh
|
$484
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,213 | $35,000 |
$1,112
23,760
kWh
|
$726
-
kW-mo/yr
|
- | $(-625.0) | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $788 | $2,200 |
$476
10,128
kWh
|
$312
-
kW-mo/yr
|
- | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $337 | $1,750 |
$337
7,200
kWh
|
- | - | - | |
| 07 | 2.2437: Recover waste heat from equipment | $51,028 | $24,300 | - | - |
$51,028
-
MMBtu
|
- | |
| 08 | 2.1116: Improve combustion control capability | $10,244 | $2,000 | - | - |
$10,244
-
MMBtu
|
- | |
| 09 | 2.2511: Insulate bare equipment | $5,734 | $1,600 | - | - |
$5,734
-
MMBtu
|
- | |
| 10 | 2.2511: Insulate bare equipment | $3,846 | $23,040 | - | - |
$3,846
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $82,826 | $94,950 |
$6,945
148,373
kWh
|
$5,051
-
kW-mo/yr
|
$70,852
-
MMBtu
|
$(-22.0) | ||
| TOTAL IMPLEMENTED | $17,371 | $43,860 |
$6,608
141,173
kWh
|
$5,051
-
kW-mo/yr
|
$5,734
-
MMBtu
|
$(-22.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs