ITAC Assessment: UD0808
ITAC logo
ITAC Assessment: UD0808
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Hot dip galvannealed coiled steel sheet
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 313,480
ft2
Annual Production 450,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,403,255 39,884,880
kWh
Electricity Demand $966,952 7,520
kW-mo/yr
Natural Gas $3,011,389 386,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $870,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $200,411 $425,000 $144,214
4,005,948
kWh
$49,882
-
kW-mo/yr
- - - $6,315
02 2.6218: Turn off equipment when not in use $108,914 $25,000 $80,921
2,247,816
kWh
$27,993
-
kW-mo/yr
- - - -
03 2.1113: Reduce combustion air flow to optimum $95,164 $300,000 - - - $95,164
-
MMBtu
- -
04 2.3212: Optimize plant power factor $74,208 $223,000 - - $74,208 - - -
05 2.7241: Install outside air damper / economizer on hvac unit $68,888 $60,000 $(-4,127.0)
(-114,627)
kWh
$(-2,050.0)
-
kW-mo/yr
- $75,065
-
MMBtu
- -
06 2.5111: Convert from indirect to direct fired systems $67,977 $135,954 $24,406
589,680
kWh
$8,803
-
kW-mo/yr
- $34,768
-
MMBtu
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $43,538 $59,100 $43,538
1,243,930
kWh
- - - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $43,197 $23,136 $7,717
214,368
kWh
$3,480
-
kW-mo/yr
- - - $32,000
09 2.2514: Cover open tanks $25,313 - $18,463
527,520
kWh
$6,850
-
kW-mo/yr
- - - -
10 2.4239: Eliminate or reduce compressed air usage $22,771 $1,840 $16,735
464,856
kWh
$6,036
-
kW-mo/yr
- - - -
11 2.2611: Moderate cooling tower outlet temperature $18,970 $20,000 $16,025
445,141
kWh
$2,945
-
kW-mo/yr
- - - -
12 2.4224: Upgrade controls on compressors $17,167 - $12,616
350,442
kWh
$4,551
-
kW-mo/yr
- - - -
13 2.2511: Insulate bare equipment $15,493 $33,695 - - - $15,493
-
MMBtu
- -
14 2.4222: Install adequate dryers on air lines to eliminate blowdown $10,381 $34,730 $7,629
211,928
kWh
$2,752
-
kW-mo/yr
- - - -
15 2.7142: Utilize higher efficiency lamps and/or ballasts $9,291 $17,933 $1,990
229,204
kWh
$8,251
-
kW-mo/yr
- - - $(-950.0)
16 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,446 $1,000 $7,530
209,160
kWh
$2,716
-
kW-mo/yr
- - $(-1,200.0) $(-600.0)
17 2.2511: Insulate bare equipment $8,068 $11,383 - - - $8,068
-
MMBtu
- -
18 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,518 $21,818 $7,518
208,824
kWh
- - - - -
19 2.7142: Utilize higher efficiency lamps and/or ballasts $7,269 $20,543 $7,677
213,258
kWh
$2,769
-
kW-mo/yr
- - - $(-3,177.0)
20 2.7142: Utilize higher efficiency lamps and/or ballasts $4,344 $7,155 $4,087
113,521
kWh
$951
-
kW-mo/yr
- - - $(-694.0)
21 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,836 - $3,721
106,680
kWh
$115
-
kW-mo/yr
- - - -
22 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,305 $18,884 $2,411
68,880
kWh
$894
-
kW-mo/yr
- - - -
23 2.4133: Use most efficient type of electric motors $2,412 $5,050 $1,736
49,600
kWh
$676
-
kW-mo/yr
- - - -
24 2.6218: Turn off equipment when not in use $2,053 - $2,053
58,667
kWh
- - - - -
25 2.7142: Utilize higher efficiency lamps and/or ballasts $1,670 - $1,560
43,344
kWh
$563
-
kW-mo/yr
- - - $(-453.0)
TOTAL RECOMMENDED $870,604 $1,445,221 $408,420
11,488,140
kWh
$128,177
-
kW-mo/yr
$74,208 $228,558
-
MMBtu
$(-1,200.0) $32,441
TOTAL IMPLEMENTED $12,282 $1,000 $11,251
315,840
kWh
$2,831
-
kW-mo/yr
- - $(-1,200.0) $(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs