ITAC Assessment: UD0804
ITAC logo
ITAC Assessment: UD0804
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Parchment and converting paper
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 181,808
ft2
Annual Production 10,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,406 4,981,880
kWh
Natural Gas $1,204,727 102,506
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $129,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $49,362 $48,000 - - $49,362
-
MMBtu
- -
02 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $38,869 $12,000 - - $38,869
-
MMBtu
- -
03 2.7311: Ventilation system to shut off when room is not in use $35,001 $9,000 $741
22,464
kWh
- $34,260
-
MMBtu
- -
04 2.2113: Repair or replace steam traps $23,089 $4,000 - - $23,089
-
MMBtu
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $17,277 $500 - - $17,277
-
MMBtu
- -
06 2.7313: Recycle air for heating, ventilation and air conditioning $10,661 $6,000 - - $10,661
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $10,414 $30,134 $5,217
158,095
kWh
$4,024
-
kW-mo/yr
- - $1,173
08 2.1232: Keep boiler tubes clean $8,490 $600 - - $8,490
-
MMBtu
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $7,589 $5,523 $4,296
130,179
kWh
$3,313
-
kW-mo/yr
- - $(-20.0)
10 2.2414: Use waste heat from hot flue gases to preheat $6,963 $2,000 - - $6,963
-
MMBtu
- -
11 2.2437: Recover waste heat from equipment $5,128 - - - $5,128
-
MMBtu
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $4,004 $12,597 $1,706
51,702
kWh
$1,316
-
kW-mo/yr
- - $982
13 2.6218: Turn off equipment when not in use $2,560 - $2,560
82,152
kWh
- - - -
14 2.4226: Use / purchase optimum sized compressor $1,920 $1,000 $1,920
58,188
kWh
- - - -
15 2.2522: Isolate hot or cold equipment $1,306 - $1,306
123
kWh
- - - -
16 2.7142: Utilize higher efficiency lamps and/or ballasts $1,160 $2,094 $589
17,856
kWh
$455
-
kW-mo/yr
- - $116
17 3.4116: Meter recycled water (to reduce sewer charges) $270 $500 - - - $270
-
Tgal
-
TOTAL RECOMMENDED $224,063 $133,948 $18,335
520,759
kWh
$9,108
-
kW-mo/yr
$194,099
-
MMBtu
$270
-
Tgal
$2,251
TOTAL IMPLEMENTED $129,160 $26,100 $2,047
22,587
kWh
- $127,113
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs