Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Sensors and Instruments
NAICS 334417: Electronic Connector Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 65,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 3,570
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,407 1,927,560
kWh
Electricity Demand $40,706 339
kW-mo/yr
Natural Gas $43,326 3,589
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7311: Ventilation system to shut off when room is not in use $18,742 $14,833 $2,351
61,891
kWh
- $16,391
-
MMBtu
-
02 2.7314: Reduce ventilation air $10,610 $14,833 $3,918
52,788
kWh
- $6,692
-
MMBtu
-
03 2.7226: Use computer programs to optimize hvac performance $4,599 $14,833 - - $4,599
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,877 $16,721 $1,593
63,711
kWh
$1,979
-
kW-mo/yr
- $305
05 2.7241: Install outside air damper / economizer on hvac unit $1,100 $14,833 $1,100
15,953
kWh
- - -
06 2.4226: Use / purchase optimum sized compressor $1,087 - $612
24,480
kWh
$475
-
kW-mo/yr
- -
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $993 $45,000 $993
39,726
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $62 - $35
1,408
kWh
$27
-
kW-mo/yr
- -
TOTAL RECOMMENDED $41,070 $121,053 $10,602
259,957
kWh
$2,481
-
kW-mo/yr
$27,682
-
MMBtu
$305
TOTAL IMPLEMENTED $39,921 $121,053 $9,955
234,069
kWh
$1,979
-
kW-mo/yr
$27,682
-
MMBtu
$305
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs