ITAC Assessment: UD0798
ITAC logo
ITAC Assessment: UD0798
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product plastic containers
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 175,000
ft2
Annual Production 61,082,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,038,167 27,937,200
kWh
Electricity Demand $534,813 4,153
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $361,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,868

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $177,970 $480,000 $103,635
529,200
kWh
$38,335
-
kW-mo/yr
- $36,000
02 2.2511: Insulate bare equipment $56,464 $62,640 $41,217
876,960
kWh
$15,247
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $28,050 - $28,050
596,820
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,344 $62,000 $19,481
414,500
kWh
$7,207
-
kW-mo/yr
$(-3,551.0) $207
05 2.4133: Use most efficient type of electric motors $22,669 $32,084 $7,296
155,232
kWh
$3,373
-
kW-mo/yr
- $12,000
06 2.4224: Upgrade controls on compressors $21,417 - $15,634
332,640
kWh
$5,783
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,830 $25,242 $18,830
402,360
kWh
- - -
08 2.4224: Upgrade controls on compressors $7,626 - $2,059
118,440
kWh
$5,567
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $3,462 - $935
53,760
kWh
$2,527
-
kW-mo/yr
- -
10 2.4112: Install soft-start to eliminate nuisance trips $1,678 - $1,154
24,668
kWh
$524
-
kW-mo/yr
- -
11 2.6218: Turn off equipment when not in use $341 - $341
7,280
kWh
- - -
TOTAL RECOMMENDED $361,851 $661,966 $238,632
3,511,860
kWh
$78,563
-
kW-mo/yr
$(-3,551.0) $48,207
TOTAL IMPLEMENTED $57,868 $62,000 $39,604
951,288
kWh
$21,608
-
kW-mo/yr
$(-3,551.0) $207