Assessment Year | 2008 |
---|---|
Principal Product | Folding Cartons |
NAICS | 322212: Folding Paperboard Box Manufacturing |
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $100 M to 500M |
# of Employees | 235 |
Plant Area |
229,630
ft2
|
Annual Production | 105,000,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $743,553 | 14,198,362 |
kWh
|
$0.052 |
Natural Gas | $284,925 | 29,868 |
MMBtu
|
$9.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $119,988 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $94,849 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $47,843 | $62,700 | - | - | - |
$47,843
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,242 | $107,122 |
$15,120
1,008,000
kWh
|
$15,941
-
kW-mo/yr
|
- | - | - | $4,181 | |
03 | 2.4239: Eliminate or reduce compressed air usage | $12,341 | $6,560 |
$6,562
437,220
kWh
|
$5,779
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $9,025 | $2,424 | - | - | - |
$9,025
-
MMBtu
|
- | - | |
05 | 2.3212: Optimize plant power factor | $7,098 | $39,000 | - | - | $7,098 | - | - | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,330 | $300 | - | - | - | - |
$2,330
-
Tgal
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,714 | $2,828 |
$553
36,855
kWh
|
$1,161
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,656 | - |
$806
53,760
kWh
|
$850
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,351 | $1,000 |
$1,159
77,280
kWh
|
$1,192
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $388 | $1,000 |
$189
12,600
kWh
|
$199
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $119,988 | $222,934 |
$24,389
1,625,715
kWh
|
$25,122
-
kW-mo/yr
|
$7,098 |
$56,868
-
MMBtu
|
$2,330
-
Tgal
|
$4,181 | ||
TOTAL IMPLEMENTED | $94,849 | $174,246 |
$16,468
1,097,880
kWh
|
$17,332
-
kW-mo/yr
|
- |
$56,868
-
MMBtu
|
- | $4,181 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs