Assessment Year | 2008 |
---|---|
Principal Product | Hinges |
NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
180,000
ft2
|
Annual Production | 8,500,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,108 | 1,041,600 |
kWh
|
$0.10 |
Natural Gas | $99,778 | 7,360 |
MMBtu
|
$13.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,784 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,957 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7229: Air condition only space necessary | $33,340 | $66,680 | - | - |
$33,340
-
MMBtu
|
- | |
02 | 2.7226: Use computer programs to optimize hvac performance | $16,751 | $15,000 | - | - |
$16,751
-
MMBtu
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $8,467 | $5,000 | - | - |
$8,467
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,109 | $9,240 |
$938
30,260
kWh
|
$1,757
-
kW-mo/yr
|
- | $414 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,446 | - |
$818
26,400
kWh
|
$1,628
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,387 | $1,280 |
$2,387
77,000
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,608 | $5,812 |
$811
29,142
kWh
|
$797
-
kW-mo/yr
|
- | - | |
08 | 2.7495: Install replacement doors | $1,292 | $7,600 | - | - |
$1,292
-
MMBtu
|
- | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,154 | - |
$1,154
37,300
kWh
|
- | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $927 | $140 |
$310
10,000
kWh
|
$617
-
kW-mo/yr
|
- | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $303 | $1,000 |
$198
6,400
kWh
|
$105
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $71,784 | $111,752 |
$6,616
216,502
kWh
|
$4,904
-
kW-mo/yr
|
$59,850
-
MMBtu
|
$414 | ||
TOTAL IMPLEMENTED | $67,957 | $98,200 |
$5,495
177,360
kWh
|
$3,490
-
kW-mo/yr
|
$58,558
-
MMBtu
|
$414 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs