Assessment Year | 2008 |
---|---|
Principal Product | Pork Rinds |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
100,000
ft2
|
Annual Production | 31,100,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $373,708 | 6,838,728 |
kWh
|
$0.055 |
Natural Gas | $1,735,598 | 173,712 |
MMBtu
|
$9.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $367,880 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,941 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $199,480 | $23,400 | - | - | - |
$199,480
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $66,859 | $121,500 | - | - | - |
$66,859
-
MMBtu
|
|
03 | 2.1224: Replace boiler | $54,105 | $88,560 | - | - | - |
$54,105
-
MMBtu
|
|
04 | 2.2514: Cover open tanks | $13,767 | $55,000 | - | - | - |
$13,767
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,828 | $98,908 |
$5,832
216,000
kWh
|
$5,996
-
kW-mo/yr
|
- | - | |
06 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,484 | $640 | - | - | - |
$5,484
-
MMBtu
|
|
07 | 2.4226: Use / purchase optimum sized compressor | $4,742 | $5,924 |
$4,742
175,651
kWh
|
- | - | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,606 | - | - | - | - |
$3,606
-
MMBtu
|
|
09 | 2.3212: Optimize plant power factor | $3,317 | $4,500 | - | - | $3,317 | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,512 | $1,000 |
$2,025
75,012
kWh
|
$1,487
-
kW-mo/yr
|
- | - | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,180 | - |
$680
25,200
kWh
|
$500
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $367,880 | $399,432 |
$13,279
491,863
kWh
|
$7,983
-
kW-mo/yr
|
$3,317 |
$343,301
-
MMBtu
|
||
TOTAL IMPLEMENTED | $86,941 | $227,332 |
$12,599
466,663
kWh
|
$7,483
-
kW-mo/yr
|
- |
$66,859
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs