ITAC Assessment: TN0474
ITAC logo
ITAC Assessment: TN0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BOURBON WHISKEY
NAICS
n/a
SIC 2085: Distilled and Blended Liquors
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area
n/a
Annual Production 178,000
pieces
Production Hrs. Annual 2,397
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,886 932,884
kWh
Natural Gas $121,547 41,564
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2121: Increase amount of condensate returned $12,054 $3,630 - $12,054
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $1,201 $885 - $1,201
-
MMBtu
03 2.2511: Insulate bare equipment $792 $540 - $792
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $257 $170 $257
3,517
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $364 $500 $364
4,982
kWh
-
06 2.4312: Improve lubrication practices $257 - $257
3,517
kWh
-
TOTAL RECOMMENDED $14,925 $5,725 $878
12,016
kWh
$14,047
-
MMBtu
TOTAL IMPLEMENTED $14,925 $5,725 $878
12,016
kWh
$14,047
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs