ITAC Assessment: OK0506
ITAC logo
ITAC Assessment: OK0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Animal Feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 45,000
ft2
Annual Production 35,000
ton
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,252 1,584,701
kWh
Electricity Fees $2,780 -
Natural Gas $23,392 6,897
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,331 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $820 $2,304 $820
20,223
kWh
- -
02 2.7261: Install timers and/or thermostats $104 $126 - $104
-
MMBtu
-
03 2.1231: Establish burner maintenance schedule for boilers $705 $100 - $705
-
MMBtu
-
04 3.5315: Lease / purchase baler; sell cardboard to recycler $1,449 $4,180 - - $1,449
-
lb
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $172 $60 $172
2,931
kWh
- -
06 2.2511: Insulate bare equipment $81 $168 - $81
-
MMBtu
-
TOTAL RECOMMENDED $3,331 $6,938 $992
23,154
kWh
$890
-
MMBtu
$1,449
-
lb
TOTAL IMPLEMENTED $1,801 $2,590 $992
23,154
kWh
$809
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs