| Assessment Year | 2008 |
|---|---|
| Principal Product | Aluminum Recycling |
| NAICS | 331314: Secondary Smelting and Alloying of Aluminum |
| SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
| Sales Range | $100 M to 500M |
| # of Employees | 210 |
| Plant Area |
326,000
ft2
|
| Annual Production | 340,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,396,584 | 22,674,843 |
kWh
|
$0.062 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $360,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $203,704 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $118,235 | $50,000 |
$24,723
398,764
kWh
|
- |
$93,512
-
MMBtu
|
- | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $94,656 | $6,000 | - | - |
$94,656
-
MMBtu
|
- | |
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $83,440 | $5,000 | - | - |
$83,440
-
MMBtu
|
- | |
| 04 | 2.4323: Use optimum size and capacity equipment | $15,764 | $4,008 |
$11,808
240,990
kWh
|
$3,956
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,705 | $3,275 |
$7,277
148,512
kWh
|
$2,428
-
kW-mo/yr
|
- | - | |
| 06 | 2.7132: Install timers on light switches in little used areas | $9,454 | - |
$7,089
144,668
kWh
|
$2,365
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,208 | $12,758 |
$6,489
132,420
kWh
|
$2,165
-
kW-mo/yr
|
- | $554 | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,237 | - |
$6,181
126,144
kWh
|
$2,056
-
kW-mo/yr
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,863 | $6,540 |
$3,764
96,445
kWh
|
$775
-
kW-mo/yr
|
- | $324 | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,371 | $2,250 |
$3,371
68,796
kWh
|
- | - | - | |
| 11 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $3,078 | - |
$3,078
62,810
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $360,011 | $89,831 |
$73,780
1,419,549
kWh
|
$13,745
-
kW-mo/yr
|
$271,608
-
MMBtu
|
$878 | ||
| TOTAL IMPLEMENTED | $203,704 | $16,525 |
$20,815
424,786
kWh
|
$4,793
-
kW-mo/yr
|
$178,096
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs