ITAC Assessment: UD0768
ITAC logo
ITAC Assessment: UD0768
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Various Composite Products
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 108
Plant Area 200,000
ft2
Annual Production 7,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,500 3,820,973
kWh
Natural Gas $86,105 7,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,680 $80,800 $6,509
216,960
kWh
$12,267
-
kW-mo/yr
- $904 -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,440 $46,362 $11,440
381,327
kWh
- - - -
03 2.7232: Replace existing hvac unit with high efficiency model $10,780 $20,512 $450
14,984
kWh
- $10,330
-
MMBtu
- -
04 2.7132: Install timers on light switches in little used areas $8,081 $4,600 $1,656
55,200
kWh
$6,425
-
kW-mo/yr
- - -
05 2.1224: Replace boiler $5,791 $40,000 - - $5,791
-
MMBtu
- -
06 2.6218: Turn off equipment when not in use $5,131 $1,000 - - - - $5,131
-
Tgal
07 2.4224: Upgrade controls on compressors $2,180 - $2,180
72,677
kWh
- - - -
08 2.7261: Install timers and/or thermostats $1,410 $400 $565
18,833
kWh
- $845
-
MMBtu
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $860 - - - $860
-
MMBtu
- -
TOTAL RECOMMENDED $65,353 $193,674 $22,800
759,981
kWh
$18,692
-
kW-mo/yr
$17,826
-
MMBtu
$904 $5,131
-
Tgal
TOTAL IMPLEMENTED $3,040 - $2,180
72,677
kWh
- $860
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs