Assessment Year | 2007 |
---|---|
Principal Product | Detergents and Emulsifiers |
NAICS | 325612: Polish and Other Sanitation Good Manufacturing |
SIC | 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants |
Sales Range | $50 M to 100M |
# of Employees | 25 |
Plant Area |
12,000
ft2
|
Annual Production | 90,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $291,059 | 4,637,283 |
kWh
|
$0.063 |
Natural Gas | $214,834 | 18,546 |
MMBtu
|
$11.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,809 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $10,167 | $6 | - | - |
$10,167
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,480 | - | - | - | - |
$4,480
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $4,030 | $2,760 | - | - |
$4,030
-
MMBtu
|
- | |
04 | 2.4151: Develop a repair/replace policy | $3,677 | $13,959 |
$1,694
52,926
kWh
|
$1,983
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,006 | $1,250 |
$1,684
52,560
kWh
|
$1,322
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,886 | $6,000 |
$1,614
50,450
kWh
|
$1,272
-
kW-mo/yr
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,153 | $2,634 |
$743
23,214
kWh
|
$1,410
-
kW-mo/yr
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $563 | $48 |
$248
9,828
kWh
|
$315
-
kW-mo/yr
|
- | - | |
09 | 2.7134: Use photocell controls | $517 | $105 |
$156
4,893
kWh
|
$361
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $31,479 | $26,762 |
$6,139
193,871
kWh
|
$6,663
-
kW-mo/yr
|
$14,197
-
MMBtu
|
$4,480
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,809 | $24,023 |
$5,240
165,764
kWh
|
$4,892
-
kW-mo/yr
|
$14,197
-
MMBtu
|
$4,480
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs