ITAC Assessment: UD0751
ITAC logo
ITAC Assessment: UD0751
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Rubber, Plastic and Thermoplastic components
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3096:
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area 308,000
ft2
Annual Production 700,000,000
pieces
Production Hrs. Annual 6,468
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,134,901 28,238,400
kWh
Electricity Demand $265,995 62,294
kW-mo/yr
Natural Gas $750,536 73,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $256,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.2162: Reduce excess steam bleeding $90,000 $18,000 - - $87,000
-
MMBtu
$3,000
-
Tgal
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $63,687 - $50,853
1,265,303
kWh
$12,834
-
kW-mo/yr
- - - -
03 2.4226: Use / purchase optimum sized compressor $32,112 - $26,307
654,562
kWh
$5,805
-
kW-mo/yr
- - - -
04 2.3212: Optimize plant power factor $21,149 $61,500 - - - - $21,149 -
05 2.1133: Adjust burners for efficient operation $13,248 $10,000 - - $13,248
-
MMBtu
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,066 $28,800 $7,016
175,412
kWh
$1,545
-
kW-mo/yr
- - - $505
07 2.1233: Analyze flue gas for proper air/fuel ratio $9,000 - - - $9,000
-
MMBtu
- - -
08 2.2311: Heat treat parts only to required specifications or standards $8,395 $2,000 - - $8,395
-
MMBtu
- - -
09 2.1243: Use heat from boiler blowdown to preheat boiler feed water $7,062 $12,000 - - $7,062
-
MMBtu
- - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,759 $5,000 $2,262
56,272
kWh
$497
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $256,478 $137,300 $86,438
2,151,549
kWh
$20,681
-
kW-mo/yr
$124,705
-
MMBtu
$3,000
-
Tgal
$21,149 $505
TOTAL IMPLEMENTED $66,446 $5,000 $53,115
1,321,575
kWh
$13,331
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs