| Assessment Year | 2006 |
|---|---|
| Principal Product | Iron and Steel Castings |
| NAICS | 332111: Iron and Steel Forging |
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $5 M to 10M |
| # of Employees | 93 |
| Plant Area |
120,000
ft2
|
| Annual Production | 3,600,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $340,457 | 5,203,036 |
kWh
|
$0.065 |
| Natural Gas | $245,576 | 24,924 |
MMBtu
|
$9.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $48,094 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $26,993 | $2,000 |
$26,993
457,500
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $20,324 | $10,000 |
$16,048
272,000
kWh
|
$4,276
-
kW-mo/yr
|
- | |
| 03 | 2.2511: Insulate bare equipment | $19,239 | $7,105 | - | - |
$19,239
-
MMBtu
|
|
| 04 | 2.2424: Use heat in flue gases to preheat products or materials | $6,408 | - | - | - |
$6,408
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,123 | $1,530 |
$1,683
28,533
kWh
|
$440
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $372 | $212 |
$372
6,300
kWh
|
- | - | |
| TOTAL RECOMMENDED | $75,459 | $20,847 |
$45,096
764,333
kWh
|
$4,716
-
kW-mo/yr
|
$25,647
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $48,094 | $18,635 |
$17,731
300,533
kWh
|
$4,716
-
kW-mo/yr
|
$25,647
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs