Assessment Year | 2006 |
---|---|
Principal Product | Iron and Steel Castings |
NAICS | 332111: Iron and Steel Forging |
SIC | 3462: Iron and Steel Forgings |
Sales Range | $5 M to 10M |
# of Employees | 93 |
Plant Area |
120,000
ft2
|
Annual Production | 3,600,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $340,457 | 5,203,036 |
kWh
|
$0.065 |
Natural Gas | $245,576 | 24,924 |
MMBtu
|
$9.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,094 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $26,993 | $2,000 |
$26,993
457,500
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $20,324 | $10,000 |
$16,048
272,000
kWh
|
$4,276
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $19,239 | $7,105 | - | - |
$19,239
-
MMBtu
|
|
04 | 2.2424: Use heat in flue gases to preheat products or materials | $6,408 | - | - | - |
$6,408
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,123 | $1,530 |
$1,683
28,533
kWh
|
$440
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $372 | $212 |
$372
6,300
kWh
|
- | - | |
TOTAL RECOMMENDED | $75,459 | $20,847 |
$45,096
764,333
kWh
|
$4,716
-
kW-mo/yr
|
$25,647
-
MMBtu
|
||
TOTAL IMPLEMENTED | $48,094 | $18,635 |
$17,731
300,533
kWh
|
$4,716
-
kW-mo/yr
|
$25,647
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs