ITAC Assessment: MI0038
ITAC logo
ITAC Assessment: MI0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product multi-pin cicular and rectangular connectors
NAICS
n/a
SIC 3678: Electronic Connectors
Sales Range $5
M
to 10
M
# of Employees 53
Plant Area 18,600
ft2
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,319 459,900
kWh
Electricity Demand $9,034 1,234
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $214,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,613

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 4.112: Replace old machine with new automatic multi-station tool $190,000 $100,000 - - - $190,000
02 4.111: Add equipment/ operators to reduce production bottleneck $18,650 $26,450 - - $18,650 -
03 2.7232: Replace existing hvac unit with high efficiency model $3,094 $4,500 $3,094
48,951
kWh
- - -
04 2.4112: Install soft-start to eliminate nuisance trips $1,846 $2,345 - $1,846
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $963 $250 - - $963 -
TOTAL RECOMMENDED $214,553 $133,545 $3,094
48,951
kWh
$1,846
-
kW-mo/yr
$19,613 $190,000
TOTAL IMPLEMENTED $19,613 $26,700 - - $19,613 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs