ITAC Assessment: UD0736
ITAC logo
ITAC Assessment: UD0736
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Hydrotope, sulfonic acids
NAICS 325613: Surface Active Agent Manufacturing
SIC 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 274,428
ft2
Annual Production 140,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,681 5,035,300
kWh
Electricity Demand $125,850 9,708
kW-mo/yr
Natural Gas $1,182,859 156,798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $878,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $324,794

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 4.652: Replace existing equipment with more suitable substitutes $511,635 $1,058,400 - - $16,807
-
MMBtu
- $494,828
02 2.2414: Use waste heat from hot flue gases to preheat $151,099 $230,000 - - $141,974
-
MMBtu
- $9,125
03 2.2135: Repair and eliminate steam leaks $36,074 $28,000 - - $35,448
-
MMBtu
$626
-
gal
-
04 2.2136: Install / repair insulation on steam lines $35,184 $14,041 - - $35,184
-
MMBtu
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $32,384 $28,000 - - $32,384
-
MMBtu
- -
06 2.2414: Use waste heat from hot flue gases to preheat $29,264 $40,000 - - $29,264
-
MMBtu
- -
07 2.2511: Insulate bare equipment $14,596 $6,878 - - $14,596
-
MMBtu
- -
08 2.2123: Insulate feedwater tank $12,187 $6,825 - - $12,187
-
MMBtu
- -
09 2.2113: Repair or replace steam traps $11,892 $240 - - $11,892
-
MMBtu
- -
10 2.4239: Eliminate or reduce compressed air usage $9,947 $15,000 $463
8,900
kWh
$9,484
-
kW-mo/yr
- - -
11 3.4113: Treat and reuse rinse waters $9,788 $10,000 - - - $9,788
-
gal
-
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,612 $26,000 $6,559
126,144
kWh
$3,053
-
kW-mo/yr
- - -
13 2.1233: Analyze flue gas for proper air/fuel ratio $7,098 - - - $7,098
-
MMBtu
- -
14 2.4224: Upgrade controls on compressors $4,542 - $3,058
58,800
kWh
$1,484
-
kW-mo/yr
- - -
15 2.4231: Reduce the pressure of compressed air to the minimum required $1,790 - $1,223
23,520
kWh
$567
-
kW-mo/yr
- - -
16 2.2135: Repair and eliminate steam leaks $1,390 $2,800 - - $1,367
-
MMBtu
$23
-
gal
-
TOTAL RECOMMENDED $878,482 $1,466,184 $11,303
217,364
kWh
$14,588
-
kW-mo/yr
$338,201
-
MMBtu
$10,437
-
gal
$503,953
TOTAL IMPLEMENTED $324,794 $373,106 $6,559
126,144
kWh
$3,053
-
kW-mo/yr
$305,431
-
MMBtu
$626
-
gal
$9,125
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs