ITAC Assessment: UD0725
ITAC logo
ITAC Assessment: UD0725
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Cold Roll Round Steel Products
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,439 3,133,919
kWh
Electricity Demand $11,688 9,780
kW-mo/yr
Natural Gas $124,303 18,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 3.5311: Recover and reuse waste material $45,000 $50,000 - - - - $45,000
-
gal
-
02 2.4239: Eliminate or reduce compressed air usage $10,989 $792 $7,722
214,500
kWh
$3,267
-
kW-mo/yr
- - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $6,863 $28,350 $1,891
39,200
kWh
$503
-
kW-mo/yr
- $4,469
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,772 $18,444 $3,905
110,000
kWh
$1,675
-
kW-mo/yr
- - - $192
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,315 $1,320 - - - $4,315
-
MMBtu
- -
06 2.2511: Insulate bare equipment $4,269 $3,192 - - - $4,269
-
MMBtu
- -
07 2.3212: Optimize plant power factor $3,254 $10,800 - - $3,254 - - -
08 2.2511: Insulate bare equipment $1,968 - - $1,968
-
kW-mo/yr
- - - -
09 2.7135: Install occupancy sensors $1,788 $728 $1,420
39,444
kWh
$368
-
kW-mo/yr
- - - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $632 $1,170 $444
12,320
kWh
$188
-
kW-mo/yr
- - - -
11 2.4221: Install compressor air intakes in coolest locations $564 $296 $396
11,000
kWh
$168
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $85,414 $115,092 $15,778
426,464
kWh
$8,137
-
kW-mo/yr
$3,254 $13,053
-
MMBtu
$45,000
-
gal
$192
TOTAL IMPLEMENTED $20,706 $48,842 $7,216
188,644
kWh
$4,514
-
kW-mo/yr
- $8,784
-
MMBtu
- $192
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs