ITAC Assessment: UD0716
ITAC logo
ITAC Assessment: UD0716
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Lift truck parts and Accessories
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 180,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,659 5,047,788
kWh
Electricity Demand $219,922 11,924
kW-mo/yr
Natural Gas $166,647 18,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3137: Use power during off-peak periods $72,768 - - $72,768
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $48,047 $65,800 $17,266
719,400
kWh
$30,084
-
kW-mo/yr
- - $697
03 2.7244: Revise smoke cleanup from operations $38,756 $150,000 $645
26,895
kWh
$681
-
kW-mo/yr
$37,430
-
MMBtu
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $8,151 $3,200 $1,518
63,250
kWh
$6,633
-
kW-mo/yr
- - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,088 - $350
14,575
kWh
- $4,738
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,922 $1,440 $859
35,785
kWh
- $4,063
-
MMBtu
- -
07 3.5311: Recover and reuse waste material $2,750 - - - - $2,750 -
08 2.2514: Cover open tanks $2,599 - $955
39,794
kWh
$1,644
-
kW-mo/yr
- - -
09 2.4221: Install compressor air intakes in coolest locations $507 - $353
14,725
kWh
- $154
-
MMBtu
- -
TOTAL RECOMMENDED $183,588 $220,440 $21,946
914,424
kWh
$111,810
-
kW-mo/yr
$46,385
-
MMBtu
$2,750 $697
TOTAL IMPLEMENTED $52,969 $67,240 $18,125
755,185
kWh
$30,084
-
kW-mo/yr
$4,063
-
MMBtu
- $697
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs