Assessment Year | 2005 |
---|---|
Principal Product | Lift truck parts and Accessories |
NAICS | 333995: Fluid Power Cylinder and Actuator Manufacturing |
SIC | 3593: Fluid Power Cylinders and Actuators |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
180,000
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,659 | 5,047,788 |
kWh
|
$0.034 |
Electricity Demand | $219,922 | 11,924 |
kW-mo/yr
|
$18.44 |
Natural Gas | $166,647 | 18,401 |
MMBtu
|
$9.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $183,588 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,969 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $72,768 | - | - |
$72,768
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48,047 | $65,800 |
$17,266
719,400
kWh
|
$30,084
-
kW-mo/yr
|
- | - | $697 | |
03 | 2.7244: Revise smoke cleanup from operations | $38,756 | $150,000 |
$645
26,895
kWh
|
$681
-
kW-mo/yr
|
$37,430
-
MMBtu
|
- | - | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $8,151 | $3,200 |
$1,518
63,250
kWh
|
$6,633
-
kW-mo/yr
|
- | - | - | |
05 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,088 | - |
$350
14,575
kWh
|
- |
$4,738
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,922 | $1,440 |
$859
35,785
kWh
|
- |
$4,063
-
MMBtu
|
- | - | |
07 | 3.5311: Recover and reuse waste material | $2,750 | - | - | - | - | $2,750 | - | |
08 | 2.2514: Cover open tanks | $2,599 | - |
$955
39,794
kWh
|
$1,644
-
kW-mo/yr
|
- | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $507 | - |
$353
14,725
kWh
|
- |
$154
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $183,588 | $220,440 |
$21,946
914,424
kWh
|
$111,810
-
kW-mo/yr
|
$46,385
-
MMBtu
|
$2,750 | $697 | ||
TOTAL IMPLEMENTED | $52,969 | $67,240 |
$18,125
755,185
kWh
|
$30,084
-
kW-mo/yr
|
$4,063
-
MMBtu
|
- | $697 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs