ITAC Assessment: UD0715
ITAC logo
ITAC Assessment: UD0715
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Aircraft Components - Generators, Converters, Controllers
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 200,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,166 8,708,232
kWh
Electricity Demand $267,657 20,508
kW-mo/yr
Natural Gas $23,640 2,515
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,129

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,797 $53,464 $14,343
531,216
kWh
$9,865
-
kW-mo/yr
- - - $589
02 2.3511: Use plant owned transformers or lease transformers $21,170 $62,500 - - $21,170 - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,402 $100 $3,965
146,880
kWh
$3,182
-
kW-mo/yr
- $10,255
-
MMBtu
- -
04 2.2135: Repair and eliminate steam leaks $2,597 $500 - - - $1,974
-
MMBtu
$623
-
Tgal
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,021 - - - - $2,021
-
MMBtu
- -
06 2.6218: Turn off equipment when not in use $1,689 - $1,689
62,546
kWh
- - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $781 $340 $463
17,136
kWh
$318
-
kW-mo/yr
- - - -
08 2.4221: Install compressor air intakes in coolest locations $781 $130 $463
17,136
kWh
$318
-
kW-mo/yr
- - - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $531 - $213
7,883
kWh
$318
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $71,769 $117,034 $21,136
782,797
kWh
$14,001
-
kW-mo/yr
$21,170 $14,250
-
MMBtu
$623
-
Tgal
$589
TOTAL IMPLEMENTED $48,129 $54,404 $18,984
703,115
kWh
$13,683
-
kW-mo/yr
- $14,250
-
MMBtu
$623
-
Tgal
$589
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs