Assessment Year | 2004 |
---|---|
Principal Product | Hard Chrome Plating of Automotive Dies |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3741: |
Sales Range | $10 M to 50M |
# of Employees | 67 |
Plant Area |
69,000
ft2
|
Annual Production | 32
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $138,529 | 3,637,106 |
kWh
|
$0.038 |
Electricity Demand | $158,837 | 8,872 |
kW-mo/yr
|
$17.90 |
Natural Gas | $154,363 | 22,729 |
MMBtu
|
$6.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $135,443 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,384 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8118: Check for accuracy of utility / power meters | $63,251 | $782 | - | - | - | - | $63,251 | - | |
02 | 2.2514: Cover open tanks | $27,270 | $4,326 | - | - |
$27,270
-
MMBtu
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,956 | $31,342 |
$9,423
336,518
kWh
|
$10,141
-
kW-mo/yr
|
- | $(-576.0) | - | $968 | |
04 | 2.4322: Use or replace with energy efficient substitutes | $11,671 | $46,000 |
$2,698
96,360
kWh
|
$2,936
-
kW-mo/yr
|
- | $2,736 | - | $3,301 | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,960 | - | - | - |
$6,960
-
MMBtu
|
- | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $4,078 | $15,000 | - | - |
$4,078
-
MMBtu
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $1,158 | $245 |
$555
19,823
kWh
|
$603
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.1213: Direct warmest air to combustion intake | $827 | $1,000 | - | - |
$827
-
MMBtu
|
- | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $272 | $750 |
$112
5,242
kWh
|
$160
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $135,443 | $99,445 |
$12,788
457,943
kWh
|
$13,840
-
kW-mo/yr
|
$39,135
-
MMBtu
|
$2,160 | $63,251 | $4,269 | ||
TOTAL IMPLEMENTED | $48,384 | $35,913 |
$9,978
356,341
kWh
|
$10,744
-
kW-mo/yr
|
$27,270
-
MMBtu
|
$(-576.0) | - | $968 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs