Assessment Year | 2004 |
---|---|
Principal Product | Color Concentrates |
NAICS | 325130: Synthetic Dye and Pigment Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 21 |
Plant Area |
36,470
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,386 | 1,131,183 |
kWh
|
$0.061 |
Natural Gas | $38,304 | 6,591 |
MMBtu
|
$5.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,596 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,609 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7311: Ventilation system to shut off when room is not in use | $10,368 | - |
$233
5,414
kWh
|
$95
-
kW-mo/yr
|
$10,040
-
MMBtu
|
- | |
02 | 2.3212: Optimize plant power factor | $3,335 | $6,000 | - | - | - | $3,335 | |
03 | 2.4224: Upgrade controls on compressors | $846 | $900 |
$654
15,200
kWh
|
$192
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $668 | $700 |
$516
12,000
kWh
|
$152
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $652 | $300 |
$563
13,104
kWh
|
$78
-
kW-mo/yr
|
- | $11 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $504 | - |
$504
11,715
kWh
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $223 | $500 |
$172
4,000
kWh
|
$51
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $16,596 | $8,400 |
$2,642
61,433
kWh
|
$568
-
kW-mo/yr
|
$10,040
-
MMBtu
|
$3,346 | ||
TOTAL IMPLEMENTED | $12,609 | $2,100 |
$2,079
48,329
kWh
|
$490
-
kW-mo/yr
|
$10,040
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs