Assessment Year | 2003 |
---|---|
Principal Product | Motor rebuild |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
131,400
ft2
|
Annual Production | 76,500
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $292,649 | 9,910,323 |
kWh
|
$0.030 |
Electricity Demand | $223,477 | 20,952 |
kW-mo/yr
|
$10.67 |
Natural Gas | $181,875 | 24,115 |
MMBtu
|
$7.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,608 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $19,216 | $6,000 | - |
$19,216
-
kW-mo/yr
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,997 | $5,000 | - |
$14,997
-
kW-mo/yr
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,900 | - | - |
$16,600
-
kW-mo/yr
|
- | $(-4,700.0) | |
04 | 2.4226: Use / purchase optimum sized compressor | $10,015 | $25,000 |
$2,015
111,790
kWh
|
$8,000
-
kW-mo/yr
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $8,147 | $2,000 |
$3,199
177,725
kWh
|
$4,948
-
kW-mo/yr
|
- | - | |
06 | 2.7122: Disconnect ballasts | $2,363 | $225 |
$1,076
51,224
kWh
|
$1,287
-
kW-mo/yr
|
- | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,739 | $500 | - | - |
$1,739
-
Tgal
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,230 | $200 |
$615
34,270
kWh
|
$615
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $69,607 | $38,925 |
$6,905
375,009
kWh
|
$65,663
-
kW-mo/yr
|
$1,739
-
Tgal
|
$(-4,700.0) | ||
TOTAL IMPLEMENTED | $38,608 | $33,200 |
$5,829
323,785
kWh
|
$32,779
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs