ITAC Assessment: UD0660
ITAC logo
ITAC Assessment: UD0660
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fine blank components
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 100,000
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,972 6,157,200
kWh
Electricity Demand $302,648 21,600
kW-mo/yr
Electricity Fees $4,451 -
Natural Gas $101,376 11,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $395,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
01 4.625: Develop standard operating procedures $280,000 $58,320 n/a - - - - - - - $280,000
02 2.4231: Reduce the pressure of compressed air to the minimum required $31,779 - $13,622
619,200
kWh
$18,157
-
kW-mo/yr
- - - - - -
03 3.5111: Filter and reuse hydraulic oil $19,375 $4,323 - - - $24,023
-
gal
$(-4,648.0) - - -
04 2.2437: Recover waste heat from equipment $15,291 $7,000 - - $15,291
-
MMBtu
- - - - -
05 2.7314: Reduce ventilation air $8,388 $15,000 - - $8,388
-
MMBtu
- - - - -
06 2.4239: Eliminate or reduce compressed air usage $7,666 $1,124 $3,379
153,600
kWh
$4,287
-
kW-mo/yr
- - - - - -
07 2.2614: Use cooling tower or economizer to replace chiller cooling $5,568 $6,545 $7,286
331,200
kWh
$7,733
-
kW-mo/yr
$(-13,851.0)
-
MMBtu
- $4,400 - - -
08 3.8132: Use less toxic and volatile solvent substitutes $5,026 $8,400 - - - $11,026
-
gal
- $(-6,000.0) - -
09 2.7141: Lower light fixtures in high ceiling areas $3,983 $14,150 $1,932
87,840
kWh
$2,051
-
kW-mo/yr
- - - - - -
10 2.3132: Recharge batteries on during off-peak demand periods $3,648 - - $3,648
-
kW-mo/yr
- - - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,905 $7,338 $1,409
64,080
kWh
$1,496
-
kW-mo/yr
- - - - - -
12 2.4239: Eliminate or reduce compressed air usage $2,763 $3,318 $1,115
50,700
kWh
$1,648
-
kW-mo/yr
- - - - - -
13 2.4222: Install adequate dryers on air lines to eliminate blowdown $2,019 $4,158 $19
867
kWh
- - - - - $2,000 -
14 2.3134: Shift from daytime to nighttime operation $1,707 - - $3,867
-
kW-mo/yr
- - $(-2,160.0) - - -
15 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,443 $1,000 $686
31,200
kWh
$757
-
kW-mo/yr
- - - - - -
16 2.2223: Enhance sensitivity of temperature control and cutoff $1,260 - - - $1,260
-
MMBtu
- - - - -
17 2.7135: Install occupancy sensors $1,080 $4,200 $878
39,888
kWh
$202
-
kW-mo/yr
- - - - - -
18 2.7142: Utilize higher efficiency lamps and/or ballasts $946 $2,442 $459
20,880
kWh
$487
-
kW-mo/yr
- - - - - -
19 2.7135: Install occupancy sensors $256 $167 $110
5,011
kWh
$146
-
kW-mo/yr
- - - - - -
20 2.6212: Turn off equipment during breaks, reduce operating time $150 - $150
6,840
kWh
- - - - - - -
TOTAL RECOMMENDED $395,253 $137,485 $31,045
1,411,306
kWh
$44,479
-
kW-mo/yr
$11,088
-
MMBtu
$35,049
-
gal
$(-2,408.0) $(-6,000.0) $2,000 $280,000
TOTAL IMPLEMENTED $50,809 $27,718 $15,573
707,940
kWh
$20,562
-
kW-mo/yr
$9,648
-
MMBtu
$11,026
-
gal
- $(-6,000.0) - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs