ITAC Assessment: UD0647
ITAC logo
ITAC Assessment: UD0647
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Ready-to-assemble furniture
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 500,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,492 11,886,000
kWh
Electricity Demand $310,128 27,108
kW-mo/yr
Natural Gas $60,500 11,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,980 $62,617 $8,052
366,000
kWh
$7,928
-
kW-mo/yr
-
02 2.7225: Close outdoor air dampers during warm-up / cool-down periods $8,910 - - - $8,910
-
MMBtu
03 2.4133: Use most efficient type of electric motors $8,519 $19,155 $3,451
156,878
kWh
$5,068
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $5,035 $8,000 $2,033
92,400
kWh
$3,002
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,715 $11,637 $2,376
108,000
kWh
$2,339
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,799 $2,324 $1,590
72,250
kWh
$2,209
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $2,899 - - - $2,899
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $1,090 $400 $440
20,000
kWh
$650
-
kW-mo/yr
-
TOTAL RECOMMENDED $50,947 $104,133 $17,942
815,528
kWh
$21,196
-
kW-mo/yr
$11,809
-
MMBtu
TOTAL IMPLEMENTED $16,698 $2,724 $2,030
92,250
kWh
$2,859
-
kW-mo/yr
$11,809
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs