ITAC Assessment: UD0641
ITAC logo
ITAC Assessment: UD0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated shipping containers, paper coating, signs and displays
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 307,000
ft2
Annual Production 850,000,000
thousand feet
Production Hrs. Annual 6,977
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,077 9,458,038
kWh
Electricity Demand $297,998 20,244
kW-mo/yr
Natural Gas $528,287 83,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $209,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.1191: Change procedures / equipment / operating conditions $72,243 - - - - - - - $72,243 - -
02 2.2414: Use waste heat from hot flue gases to preheat $31,699 $37,000 - - $31,699
-
MMBtu
- - - - - -
03 3.4111: Use closed cycle process to minimize waste water production $28,507 $400 $(-1,995.0)
(-90,701)
kWh
$(-2,211.0)
-
kW-mo/yr
- $32,713
-
Tgal
- - - - -
04 2.2443: Re-use or recycle hot or cold process exhaust air $17,780 $20,000 - - $17,780
-
MMBtu
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,888 $59,307 $8,012
364,189
kWh
$8,876
-
kW-mo/yr
- - - - - - -
06 2.7231: Use radiant heater for spot heating $15,849 $22,500 - - $15,849
-
MMBtu
- - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,676 $22,800 $5,065
230,234
kWh
$5,611
-
kW-mo/yr
- - - - - - -
08 3.5112: Reprocess spent oils on site for re-use $3,403 $3,400 - - - - $909
-
gal
- - - $2,494
09 2.7122: Disconnect ballasts $2,709 $1,968 $1,289
58,272
kWh
$1,420
-
kW-mo/yr
- - - - - - -
10 2.4221: Install compressor air intakes in coolest locations $2,588 $2,500 $1,228
55,814
kWh
$1,360
-
kW-mo/yr
- - - - - - -
11 2.7135: Install occupancy sensors $2,180 $121 $1,115
39,834
kWh
$1,065
-
kW-mo/yr
- - - - - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,957 $9,969 $648
29,453
kWh
$1,309
-
kW-mo/yr
- - - - - - -
13 2.2614: Use cooling tower or economizer to replace chiller cooling $1,451 $5,000 $714
32,448
kWh
$737
-
kW-mo/yr
- - - - - - -
14 2.8114: Change rate schedules or other changes in utility service $1,060 - - - - - - - - $1,060 -
15 3.8136: Switch to a solvent that can be cleaned and re-used $673 $1,275 - - - - $(-1,155.0)
-
gal
$1,828
-
gal
- - -
TOTAL RECOMMENDED $209,663 $186,240 $16,076
719,543
kWh
$18,167
-
kW-mo/yr
$65,328
-
MMBtu
$32,713
-
Tgal
$(-246.0)
-
gal
$1,828
-
gal
$72,243 $1,060 $2,494
TOTAL IMPLEMENTED $43,728 $35,669 $4,946
224,800
kWh
$6,069
-
kW-mo/yr
- $32,713
-
Tgal
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs