Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Adhesive application equipment
NAICS
n/a
SIC 3332:
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 77,338
ft2
Annual Production 639
pieces
Production Hrs. Annual 5,720
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,935 966,720
kWh
Electricity Demand $46,345 4,128
kW-mo/yr
Natural Gas $18,606 2,041
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,187 $8,190 $1,298
40,560
kWh
$1,889
-
kW-mo/yr
- - -
02 3.5112: Reprocess spent oils on site for re-use $3,149 $3,200 - - - $3,149
-
gal
-
03 2.4226: Use / purchase optimum sized compressor $3,139 $9,000 $(-1,006.0)
(-31,460)
kWh
$(-799.0)
-
kW-mo/yr
- - $4,944
04 2.7122: Disconnect ballasts $549 - $549
17,160
kWh
- - - -
05 2.2437: Recover waste heat from equipment $507 - - - $507
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $230 - $128
4,004
kWh
$102
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $132 $150 $74
2,288
kWh
$58
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $55 $12 $55
1,716
kWh
- - - -
TOTAL RECOMMENDED $10,948 $20,552 $1,098
34,268
kWh
$1,250
-
kW-mo/yr
$507
-
MMBtu
$3,149
-
gal
$4,944
TOTAL IMPLEMENTED $9,892 $20,552 $549
17,108
kWh
$1,250
-
kW-mo/yr
- $3,149
-
gal
$4,944
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs