Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Injection molded thermoplastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area 155,000
ft2
Annual Production 19,200,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,482 7,901,880
kWh
Electricity Demand $262,848 17,736
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,966

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 3.4111: Use closed cycle process to minimize waste water production $25,095 $6,000 $11,935
426,240
kWh
$13,160
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $17,974 $3,000 $8,548
305,280
kWh
$9,426
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $10,072 $1,560 $4,790
171,072
kWh
$5,282
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,223 $4,000 $2,484
88,704
kWh
$2,739
-
kW-mo/yr
-
05 3.4116: Meter recycled water (to reduce sewer charges) $4,373 $600 - - $4,373
-
Tgal
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,155 $5,550 $1,976
70,560
kWh
$2,179
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,150 $1,750 $2,016
72,000
kWh
$2,134
-
kW-mo/yr
-
08 2.4226: Use / purchase optimum sized compressor $2,374 - $1,129
40,320
kWh
$1,245
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,094 $180 $1,258
44,928
kWh
$836
-
kW-mo/yr
-
TOTAL RECOMMENDED $75,510 $22,640 $34,136
1,219,104
kWh
$37,001
-
kW-mo/yr
$4,373
-
Tgal
TOTAL IMPLEMENTED $53,966 $11,350 $23,628
843,840
kWh
$25,965
-
kW-mo/yr
$4,373
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs