ITAC Assessment: UD0632
ITAC logo
ITAC Assessment: UD0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Coil handling and press feeding equipment
NAICS
n/a
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 170,000
ft2
Annual Production 8
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,034 2,179,800
kWh
Electricity Demand $123,926 6,948
kW-mo/yr
Natural Gas $47,505 7,876
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,991

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $94,812 $8,000 - $94,812
-
kW-mo/yr
- -
02 4.111: Add equipment/ operators to reduce production bottleneck $33,500 $6,000 - - - $33,500
03 4.321: Optimize production lot sizes and inventories $15,075 - - - - $15,075
04 2.4226: Use / purchase optimum sized compressor $9,915 - $2,576
92,000
kWh
$7,339
-
kW-mo/yr
- -
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $5,264 - - - $5,264
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,400 $1,846 $251
8,950
kWh
$1,149
-
kW-mo/yr
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $1,355 - $1,355
48,400
kWh
- - -
08 2.2511: Insulate bare equipment $315 $435 - - $315
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $307 $12 $66
2,344
kWh
$241
-
kW-mo/yr
- -
10 2.4322: Use or replace with energy efficient substitutes $207 $300 $66
2,360
kWh
$141
-
kW-mo/yr
- -
TOTAL RECOMMENDED $162,150 $16,593 $4,314
154,054
kWh
$103,682
-
kW-mo/yr
$5,579
-
MMBtu
$48,575
TOTAL IMPLEMENTED $109,991 $8,000 $2,576
92,000
kWh
$102,151
-
kW-mo/yr
$5,264
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs