Assessment Year | 2005 |
---|---|
Principal Product | Electronic data storage units |
NAICS | 334419: Other Electronic Component Manufacturing |
SIC | 3670: |
Sales Range | $100 M to 500M |
# of Employees | 340 |
Plant Area |
338,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $630,281 | 18,188,925 |
kWh
|
$0.035 |
Electricity Demand | $285,871 | 33,921 |
kW-mo/yr
|
$8.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,573 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $118,032 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $2,020 | $3,726 |
$1,378
39,734
kWh
|
$642
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,893 | $50 |
$17,022
490,560
kWh
|
$5,611
-
kW-mo/yr
|
$4,260 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $87,704 | $291,200 |
$65,962
1,900,920
kWh
|
$21,742
-
kW-mo/yr
|
- | |
04 | 2.7229: Air condition only space necessary | $8,095 | - |
$5,653
162,908
kWh
|
$2,442
-
kW-mo/yr
|
- | |
05 | 2.7124: Make a practice of turning off lights when not needed | $30,533 | - |
$30,533
983,040
kWh
|
- | - | |
06 | 2.7261: Install timers and/or thermostats | $16,545 | $10,648 |
$16,545
532,703
kWh
|
- | - | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $13,783 | $150 |
$11,544
332,693
kWh
|
$2,239
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $185,573 | $305,774 |
$148,637
4,442,558
kWh
|
$32,676
-
kW-mo/yr
|
$4,260 | ||
TOTAL IMPLEMENTED | $118,032 | $301,998 |
$94,051
2,766,316
kWh
|
$23,981
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs