Assessment Year | 1998 |
---|---|
Principal Product | Malleable Gray Iron Castings |
NAICS |
n/a
|
SIC | 3322: Malleable Iron Foundries |
Sales Range | $5 M to 10M |
# of Employees | 135 |
Plant Area |
116,000
ft2
|
Annual Production | 9,458
ton
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,092 | 3,995,604 |
kWh
|
$0.044 |
Electricity Demand | $274,648 | 18,037 |
kW-mo/yr
|
$15.23 |
Natural Gas | $111,932 | 28,729 |
MMBtu
|
$3.90 |
Coal | $498,868 | 59,864 |
MMBtu
|
$8.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $602,015 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Coal Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $471,027 | $984,000 | - | - |
$(-116,352.0)
-
MMBtu
|
$616,881
-
MMBtu
|
$(-29,502.0)
-
MMBtu
|
|
02 | 2.1331: Burn a less expensive grade of fuel | $77,003 | $200,000 | - | - |
$(-108,061.0)
-
MMBtu
|
$185,064
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,397 | $5,000 | - |
$28,397
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,501 | $22,284 |
$13,277
166,178
kWh
|
$7,224
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,035 | $9,615 |
$739
16,999
kWh
|
$1,296
-
kW-mo/yr
|
- | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,867 | - |
$1,867
45,135
kWh
|
- | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $917 | $8,530 |
$917
21,102
kWh
|
- | - | - | - | |
08 | 2.1213: Direct warmest air to combustion intake | $268 | $472 | - | - |
$268
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $602,015 | $1,229,901 |
$16,800
249,414
kWh
|
$36,917
-
kW-mo/yr
|
$(-224,145.0)
-
MMBtu
|
$801,945
-
MMBtu
|
$(-29,502.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Coal Savings | Other Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs