ITAC Assessment: MA0421
ITAC logo
ITAC Assessment: MA0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Malleable Gray Iron Castings
NAICS
n/a
SIC 3322: Malleable Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area 116,000
ft2
Annual Production 9,458
ton
Production Hrs. Annual 2,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,092 3,995,604
kWh
Electricity Demand $274,648 18,037
kW-mo/yr
Natural Gas $111,932 28,729
MMBtu
Coal $498,868 59,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $602,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Other Gas Savings
01 2.1331: Burn a less expensive grade of fuel $471,027 $984,000 - - $(-116,352.0)
-
MMBtu
$616,881
-
MMBtu
$(-29,502.0)
-
MMBtu
02 2.1331: Burn a less expensive grade of fuel $77,003 $200,000 - - $(-108,061.0)
-
MMBtu
$185,064
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,397 $5,000 - $28,397
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,501 $22,284 $13,277
166,178
kWh
$7,224
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,035 $9,615 $739
16,999
kWh
$1,296
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,867 - $1,867
45,135
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $917 $8,530 $917
21,102
kWh
- - - -
08 2.1213: Direct warmest air to combustion intake $268 $472 - - $268
-
MMBtu
- -
TOTAL RECOMMENDED $602,015 $1,229,901 $16,800
249,414
kWh
$36,917
-
kW-mo/yr
$(-224,145.0)
-
MMBtu
$801,945
-
MMBtu
$(-29,502.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs