ITAC Assessment: SU0306
ITAC logo
ITAC Assessment: SU0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Vacuum Interrupters
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 244
Plant Area 135,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New York
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $851,207 15,172,995
kWh
Electricity Demand $68,382 27,230
kW-mo/yr
Electricity Fees $69,011 -
Natural Gas $238,906 28,607
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $105,291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.8121: Apply for tax-free status for energy purchases $19,413 - - - $19,413 - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,375 - $2,375
40,260
kWh
- - - - -
03 3.5145: Recover and reuse spent acid baths $49,465 $4,029 $(-666.0)
(-11,280)
kWh
$(-58.0)
-
kW-mo/yr
- - $50,189 -
04 2.4221: Install compressor air intakes in coolest locations $1,901 $337 $1,901
32,220
kWh
- - - - -
05 3.4115: Recover and reuse cooling water $32,137 $12,052 $(-793.0)
(-13,440)
kWh
$(-68.0)
-
kW-mo/yr
- $18,748
-
Tgal
- $14,250
-
Tgal
06 3.1191: Change procedures / equipment / operating conditions $8,700 $35,000 $(-2,797.0)
(-47,400)
kWh
$(-239.0)
-
kW-mo/yr
- - $11,736 -
07 2.3212: Optimize plant power factor $8,914 $55,516 - - $8,914 - - -
TOTAL RECOMMENDED $122,905 $106,934 $20
360
kWh
$(-365.0)
-
kW-mo/yr
$28,327 $18,748
-
Tgal
$61,925 $14,250
-
Tgal
TOTAL IMPLEMENTED $105,291 $16,418 $2,817
47,760
kWh
$(-126.0)
-
kW-mo/yr
$19,413 $18,748
-
Tgal
$50,189 $14,250
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs