Assessment Year | 2011 |
---|---|
Principal Product | Vacuum Interrupters |
NAICS | 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing |
SIC | 3629: Electrical Industrial Apparatus, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 244 |
Plant Area |
135,000
ft2
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New York |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $851,207 | 15,172,995 |
kWh
|
$0.056 |
Electricity Demand | $68,382 | 27,230 |
kW-mo/yr
|
$2.51 |
Electricity Fees | $69,011 | - |
|
- |
Natural Gas | $238,906 | 28,607 |
MMBtu
|
$8.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $122,905 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $105,291 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $19,413 | - | - | - | $19,413 | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,375 | - |
$2,375
40,260
kWh
|
- | - | - | - | - | |
03 | 3.5145: Recover and reuse spent acid baths | $49,465 | $4,029 |
$(-666.0)
(-11,280)
kWh
|
$(-58.0)
-
kW-mo/yr
|
- | - | $50,189 | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,901 | $337 |
$1,901
32,220
kWh
|
- | - | - | - | - | |
05 | 3.4115: Recover and reuse cooling water | $32,137 | $12,052 |
$(-793.0)
(-13,440)
kWh
|
$(-68.0)
-
kW-mo/yr
|
- |
$18,748
-
Tgal
|
- |
$14,250
-
Tgal
|
|
06 | 3.1191: Change procedures / equipment / operating conditions | $8,700 | $35,000 |
$(-2,797.0)
(-47,400)
kWh
|
$(-239.0)
-
kW-mo/yr
|
- | - | $11,736 | - | |
07 | 2.3212: Optimize plant power factor | $8,914 | $55,516 | - | - | $8,914 | - | - | - | |
TOTAL RECOMMENDED | $122,905 | $106,934 |
$20
360
kWh
|
$(-365.0)
-
kW-mo/yr
|
$28,327 |
$18,748
-
Tgal
|
$61,925 |
$14,250
-
Tgal
|
||
TOTAL IMPLEMENTED | $105,291 | $16,418 |
$2,817
47,760
kWh
|
$(-126.0)
-
kW-mo/yr
|
$19,413 |
$18,748
-
Tgal
|
$50,189 |
$14,250
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |