Assessment Year | 2005 |
---|---|
Principal Product | Commercial entrances, windows, and storefront systems |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $5 M to 10M |
# of Employees | 49 |
Plant Area |
88,000
ft2
|
Annual Production | 7,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,296 | 412,613 |
kWh
|
$0.088 |
Electricity Demand | $11,683 | 1,863 |
kW-mo/yr
|
$6.27 |
Natural Gas | $73,307 | 6,998 |
MMBtu
|
$10.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,519 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,767 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $13,454 | $18,500 | - | - |
$13,454
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,586 | $500 |
$5,411
60,120
kWh
|
$2,175
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $594 | $450 |
$449
4,990
kWh
|
$145
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $377 | $80 |
$258
2,871
kWh
|
$119
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $298 | $450 |
$298
3,309
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,210 | $25,315 |
$2,281
25,339
kWh
|
$929
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $25,519 | $45,295 |
$8,697
96,629
kWh
|
$3,368
-
kW-mo/yr
|
$13,454
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,767 | $26,345 |
$8,399
93,320
kWh
|
$3,368
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs