| Assessment Year | 2001 |
|---|---|
| Principal Product | plastic parts |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 54 |
| Plant Area |
66,000
ft2
|
| Annual Production | 500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $44,831 | 1,300,320 |
kWh
|
$0.034 |
| Electricity Demand | $69,316 | 6,336 |
kW-mo/yr
|
$10.94 |
| Natural Gas | $5,928 | 963 |
MMBtu
|
$6.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $107,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.1192: Reduce scrap production | $47,250 | $1,050 | n/a | - | - | - |
$47,250
-
lb
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,010 | $101,000 | n/a |
$14,605
724,800
kWh
|
$17,405
-
kW-mo/yr
|
- | - |
| 03 | 2.2511: Insulate bare equipment | $13,365 | $1,540 | n/a |
$6,600
330,000
kWh
|
$6,765
-
kW-mo/yr
|
- | - |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,787 | - | n/a |
$3,030
151,500
kWh
|
$2,757
-
kW-mo/yr
|
- | - |
| 05 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,552 | $430 | n/a | - | - |
$3,552
-
Tgal
|
- |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,378 | $7,000 | n/a |
$1,435
83,400
kWh
|
$1,943
-
kW-mo/yr
|
- | - |
| 07 | 2.4226: Use / purchase optimum sized compressor | $1,215 | $4,790 | n/a |
$600
30,000
kWh
|
$615
-
kW-mo/yr
|
- | - |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $486 | - | n/a |
$240
12,000
kWh
|
$246
-
kW-mo/yr
|
- | - |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $427 | $1,473 | n/a |
$204
10,200
kWh
|
$223
-
kW-mo/yr
|
- | - |
| 10 | 2.4133: Use most efficient type of electric motors | $251 | $722 | n/a |
$120
6,000
kWh
|
$131
-
kW-mo/yr
|
- | - |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $151 | $161 | n/a |
$72
3,600
kWh
|
$79
-
kW-mo/yr
|
- | - |
| TOTAL RECOMMENDED | $107,872 | $118,166 |
$26,906
1,351,500
kWh
|
$30,164
-
kW-mo/yr
|
$3,552
-
Tgal
|
$47,250
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs