Assessment Year | 2001 |
---|---|
Principal Product | plastic parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
66,000
ft2
|
Annual Production | 500,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,831 | 1,300,320 |
kWh
|
$0.034 |
Electricity Demand | $69,316 | 6,336 |
kW-mo/yr
|
$10.94 |
Natural Gas | $5,928 | 963 |
MMBtu
|
$6.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1192: Reduce scrap production | $47,250 | $1,050 | n/a | - | - | - |
$47,250
-
lb
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,010 | $101,000 | n/a |
$14,605
724,800
kWh
|
$17,405
-
kW-mo/yr
|
- | - |
03 | 2.2511: Insulate bare equipment | $13,365 | $1,540 | n/a |
$6,600
330,000
kWh
|
$6,765
-
kW-mo/yr
|
- | - |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,787 | - | n/a |
$3,030
151,500
kWh
|
$2,757
-
kW-mo/yr
|
- | - |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,552 | $430 | n/a | - | - |
$3,552
-
Tgal
|
- |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,378 | $7,000 | n/a |
$1,435
83,400
kWh
|
$1,943
-
kW-mo/yr
|
- | - |
07 | 2.4226: Use / purchase optimum sized compressor | $1,215 | $4,790 | n/a |
$600
30,000
kWh
|
$615
-
kW-mo/yr
|
- | - |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $486 | - | n/a |
$240
12,000
kWh
|
$246
-
kW-mo/yr
|
- | - |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $427 | $1,473 | n/a |
$204
10,200
kWh
|
$223
-
kW-mo/yr
|
- | - |
10 | 2.4133: Use most efficient type of electric motors | $251 | $722 | n/a |
$120
6,000
kWh
|
$131
-
kW-mo/yr
|
- | - |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $151 | $161 | n/a |
$72
3,600
kWh
|
$79
-
kW-mo/yr
|
- | - |
TOTAL RECOMMENDED | $107,872 | $118,166 |
$26,906
1,351,500
kWh
|
$30,164
-
kW-mo/yr
|
$3,552
-
Tgal
|
$47,250
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs